English
Deutsch
Português
Español
Pусский
Français
العربية
简体中文

Installation of floor spring

Publish Time: 2021-01-23     Origin: D and D Hardware


Floor spring installation is not a simple job.It should be done by the skilled persons.Wrongly installation may cause noice,oil leaking or speed problems.


Installation steps are as follows:


1.Choose the suitable floor spring according to the door weight and width.


2.Decide the ground digging hole position  and size.


3.Cut and dig the ground hole.


4.Put and fix the cement box with the floor spring.


5.Put the door on the floor spring.


6.Adjust the floor spring position inside the cement box.


7.Adjust the closing speed and latching speed.


8.Cover and fix the plate.


D and D HARDWARE has over 12 year’s experiences manufacturing architectural hardware products for commercial door, such as Door HingesDoor LocksLever Handles, Door Closers,Fire Exit Hardware and Glass Fittings etc., comply with CE BS EN,ULANSI/BHMA standards.

For door hardware or further information, please click here.


Contact us Now:

David Jian
Mob: 0086-139 2903 7292
Email: David@dndhardware.com, sales@danddhardware.com 

Jobby Zhang
Mob: 0086-137 2599 9617

Email: jobby@dndhardware.com


Contanct Us

Get Famous Branded Quality at Factory Cost 12th Floor, Building 2, No.898, KeChuang Technical Zone,Jianghai Dist.Jiangmen City,Guangdong,China
   +86 139 2903 7292
   +86 139 2903 7292
  +86 139 2903 7292
 David Jian(Managing Director)
 Ms Judy(Financial / Account Dept. )

To get international branded quality at factory cost

 Copyright ©2021  D&D HARDWARE INDUSTRIAL Co., Ltd . All Rights Reserved. |Sitemap